What a First Article Report Contains — and What It Proves

A first article report is a dimensional record of the first part made to a drawing: every dimension, its nominal value, the tolerance allowed and the value actually measured. We produce one before a batch is released, on parts from Ø4 to Ø150 mm outside diameter, at our workshop in Panyu, Guangzhou. This page explains what is on the report, how to read it, and the three things it cannot tell you — including why it is not a substitute for a certificate.

Why this document matters more than a certificate hereIt is evidence about a specific part, and it can be checked.

A certificate describes a system at a point in time. A first article report describes one part that exists, with numbers that can be re-measured by anyone holding it. When a buyer cannot rely on a certificate, the report is what is left — and it is a stronger document than people assume, because it is falsifiable. If a dimension on it is wrong, the part on your bench will show that immediately.

What it isA dimensional record of the first part made to a drawing, measured and written down before the batch runs.
What it is notA certificate, a process capability study, a material certificate, or a statement about parts that have not been made yet.
Who issues itUs, from measurement taken in our own inspection area. Material certificates to EN 10204 3.1 come from the material mill instead — different issuer, different subject.
Who it is forYour incoming inspection, your assembly cell, or your customer's supplier approval — whoever has to accept the first part.

We are not currently ISO 9001 certified; our certificate expired on 8 September 2025. Nothing on this page claims otherwise, and the report is offered as evidence in its own right rather than as a replacement for a system certificate.

When one gets producedFour triggers, and one on request.

A report that is produced for everything becomes a form that nobody reads. These are the cases where a new part can fail in a way the drawing does not show, so the measurement happens before the money is spent on the rest of the batch.

New partThe drawing has never run on our machines. Springs back differently, may need the angle compensated after the first piece.
Revised drawingA dimension moved. Even a small revision can change which dimension has to govern the set-up.
New toolingA die was made for this radius. The first part out of a new die is the only chance to catch a radius error before a run.
Material batch changeDifferent grade or different wall. Springback and thinning both move, and both are measured on the part rather than predicted.
Repeat order, on requestAgreed at quotation. It occupies the inspection bench, so it is a separate cost from the parts — worth having when the part is going into a safety-relevant assembly or a customer audit.
Operator setting a CNC tube bending machine
Setting the machine for a first article. The angle is corrected after the first piece is measured — which is why the report and the set-up happen together, not days apart.

What is on the reportNine fields. If one is missing, ask why.

The value of the document is in its specificity. A report that says "dimensions checked, OK" is worth nothing; a report that lists each dimension against its tolerance lets your inspector decide where to look when something does not fit. These are the fields we would expect to see on any first article report, from any supplier.

1. Part number and drawing revisionWithout the revision, the report cannot be matched to the drawing it was measured against.
2. Material grade and wallWhat the part was actually made from, not what the drawing asked for.
3. Material batch or heat numberThe link to the mill certificate. If you need 3.1 documentation, this is the field that connects the part to the paperwork.
4. Machine and dieWhich bender and which centreline radius. Two machines in the same diameter class do not spring back identically.
5. Each dimension, nominal and measuredBend angles, centreline radii, tangent lengths, cut length. The measured value beside the nominal, with the tolerance band stated.
6. Wall thickness at the outside of each bendThe thinnest point, not an average. This is the number that fails a pressure or load case.
7. Ovality at each bendExpressed as a percentage of nominal outside diameter, because that is the form the limit is written in.
8. Pass or fail, per dimensionNot one verdict for the part. A part can pass on length and fail on a tangent, and the distinction is the whole point.
9. Who measured it and whenA name and a date. A report without these is an opinion.

The tolerances these are checked against are set out on the tolerance page: ±1° on bend angle, ±1 mm on centreline radius and tangent length, ±0.5 mm on cut length, 15% maximum wall thinning and 8% maximum ovality.

How to read one without being misledThree habits that catch most of the problems.

A report full of green ticks can still describe a part that will not assemble, because the dimension that was wrong may not have been on the report. Reading it well means reading it against the drawing rather than against the word "pass".

1. Check the revision firstIf the report is against revision B and your assembly was built to revision C, the ticks mean nothing. This is the single most common mismatch.
2. Find the two or three dimensions that actually matterA part passing twenty dimensions while drifting on the one that locates it in your fixture has passed the wrong test. Mark the critical dimensions on the drawing before the order, not after.
3. Read the measured value, not the verdictA tangent at +0.9 mm is inside a ±1 mm band and is nearly out of it. If ten parts all sit at +0.9, the process is running against the top of the tolerance and the next batch is a risk.

That third habit is the difference between inspection and process control. A first article report is inspection: it tells you about one part. It becomes process control only when you compare the values across a run, which is a different exercise and needs more than one part.

What a first article report cannot tell youRead this before relying on it for an approval.

  1. It is not a certificate. We are not currently ISO 9001 certified; our certificate expired on 8 September 2025. A dimensional report does not replace a certified quality management system where procurement rules require one.
  2. It is not a material certificate. EN 10204 3.1 documentation is issued by the material mill and is available on request, subject to the raw-material batch. A dimension report says nothing about chemistry or mechanical properties.
  3. It is not proof of consistency. One measured part shows what one part did. Whether the tenth and the hundredth still hold the tangent length is a separate question, answered by measuring across a run.
  4. It is not a strength or fatigue statement. No load testing and no fatigue testing is behind any part made here. Dimensional conformity is not structural adequacy.
  5. It is not available after the fact by default. If you need a report, say so at quotation. It has to be planned into the sequence, and it has to be measured on the part before coating, because measuring after coating measures the coating as well.
  6. It does not cover a feature that was not measured. If a report shows ten dimensions and your drawing has thirty, the other twenty were not verified. Ask for the list before the order, not after the delivery.

General information only — not engineering advice. Acceptance criteria for a specific application must be confirmed by the buyer's engineer.

Questions about first article reports

What is a first article inspection report?
It is a dimensional record of the first part made to a drawing, measured against that drawing and written down. Each dimension on the report carries its nominal value, the tolerance allowed and the value actually measured, so a reader can see not only that the part passed but how close it ran to each limit. It is produced before the rest of the batch is released, not at the end of it.
When do you produce a first article report?
Whenever a part is new to us, when a drawing is revised in a way that moves a dimension, when new tooling is made, and when the material batch changes grade or wall. It is also produced on request for a repeat order, provided it is agreed at quotation, because the measurement occupies the inspection bench and is a separate cost from the parts themselves.
Does a first article report replace ISO 9001?
No, and it is not meant to. We are not currently ISO 9001 certified; our certificate expired on 8 September 2025. A first article report is evidence about one part on one day, which is a narrower and in some ways more useful thing than a certificate about a system. What it cannot do is stand in for a certified quality management system when your customer's procurement rule asks for one.
Is the first article report the same as an EN 10204 3.1 certificate?
No. They come from different parties and say different things. A 3.1 certificate is issued by the material mill and states the chemical composition and mechanical properties of the heat the tube was rolled from; it is available on request and depends on the raw-material batch. The first article report is issued here and states dimensions. A part can have either, both, or neither, and the two answer different questions.

Say at quotation if you need a report with the first part.

It changes the sequence — measurement has to happen before coating, and it has to be planned in rather than added afterwards.