Panyu District, Guangzhou · Manufacturing since 2013
Tube OD Ø4–150 mmhi@newsiyuantube.com
NewSiyuan TubeTube Bending · Panyu, Guangzhou WhatsApp

Home / Company Facts

NewSiyuan Tube company facts

NewSiyuan Tube presents custom tube fabrication by Guangzhou Panyu NEW SIYUAN Metal Processing Machinery Factory, manufacturing in Panyu, Guangzhou since 2013. Non-vehicle export orders are handled by the separate Guangzhou Xinsiyuan Technology Co., Ltd., established on 11 December 2014. The factory bends tube within Ø4–150 mm OD (outside diameter from 4 to 150 millimetres); laser cutting up to Ø220 mm is a separate, cutting-only capability.

Updated . These are capability ranges and enquiry baselines, not an unconditional specification for every part.

Manufacturing company and export company

The manufacturing company makes the tube parts. The export company handles non-vehicle export orders; it is not the manufacturing entity. The two entities use the same confirmed workshop address, but their names and establishment dates are not interchangeable.

Manufacturing companyGuangzhou Panyu NEW SIYUAN Metal Processing Machinery Factory
广州市番禺区新思远金属加工机械厂
Manufacturing since2013, in Panyu District, Guangzhou. This year refers to the manufacturing factory, not the export company.
Non-vehicle export companyGuangzhou Xinsiyuan Technology Co., Ltd.
Chinese registered name: 广州市新偲远科技有限公司.
The English name is used for trading communication; it is not presented as an English name on the Chinese business licence.
Export company established2014-12-11 (11 December 2014).
Confirmed workshop addressExact Chinese address: 广州市番禺区大龙街傍江西村将军子路7号
English reference: No. 7, Jiangjunzi Road, Bangjiangxi Village, Dalong Street, Panyu District, Guangzhou, Guangdong, China.
The Chinese wording is the precise address reference for arranging a visit or delivery.
Map pin: 22.949082, 113.399755 on Google Maps.
Opening hoursMonday to Saturday, 08:00–18:00 China Standard Time (UTC+8). Times are given in the local time used at the workshop, so overseas buyers can convert to their own working hours.
WorkforceAbout 150 people at this factory. The figure covers the manufacturing factory only; it does not include the sister workshops that run stamping and deep drawing, die casting, injection moulding and wire EDM.
Workshop floor area8,500 m² at this factory. The sister workshops are counted separately, so a combined footprint across all sites would be a larger number and should not be quoted as this one.
Vehicle export ordersSee the separate export-role explanation on motorcycle and automotive tube parts.

We are not affiliated with other companies using the name "Siyuan".

Equipment and tube ranges

Machine diameter classes describe the equipment allocation. Part feasibility still depends on material, section, wall thickness, bend radius and tooling. Tube above Ø150 mm and up to Ø220 mm can be considered for laser cutting only, not bending.

Tube benders8 machines across five diameter classes.
Up to Ø150 mm1 tube bender. Work above Ø90 mm uses this machine; scheduling is confirmed per order.
Up to Ø90 mm2 tube benders.
Up to Ø63 mm2 tube benders.
Up to Ø32 mm2 tube benders.
Up to Ø20 mm1 tube bender.
Welding equipment20 welding machines and stations.
Laser tube cutting2 tube lasers; maximum tube OD Ø220 mm, stock length 6 m. These are cutting limits, not bending limits.
Tube bending rangeØ4–150 mm OD for round tube. Square, oval and other non-round sections are reviewed against the drawing and tooling; the round-tube diameter range is not a universal non-round section limit.
Wall thickness0.8–5 mm. Diameter, wall, radius and material combinations are confirmed case by case.
MaterialsCarbon steel; 304 / 316L stainless steel; aluminium 6061 / 6063 / 7075; copper; brass. Material grade, temper and any annealing requirements are checked before acceptance.

Send the section dimensions, wall thickness, material grade, bend radius and quantity for a tube bending feasibility review. No combination is accepted from the range figures alone.

Standard-bend inspection baselines

The values below are inspection baselines for standard bends, not published batch measurements or a guarantee for every material and geometry. The applicable tolerances and measurement method are agreed against the drawing before the order. Tighter tolerances are quoted against your drawing.

Bend angle±1°.
Centreline bend radius±1 mm. Radius at the tube centreline, not at its outside surface; measurement method agreed against the drawing.
Tangent length±1 mm.
Cut length±0.5 mm.
Wall thinningMaximum 15% on standard bends.
OvalityMaximum 8% on standard bends.

See quality and inspection for the inspection workflow and document requirements.

Where each process is carried out

Tube bending is the main process. Supporting operations may be performed in the factory, at sister workshops or by external finishing suppliers. These locations are not described as one production line under one roof.

In the manufacturing factoryTube bending, laser cutting, CNC machining, sheet metal bending, welding, grinding, sandblasting, electrolytic cleaning and assembly. Electrolytic cleaning is a cleaning process, not electro-polishing.
At our sister workshopsFour supporting process groups: stamping and deep drawing; die casting; injection moulding; wire EDM. These operations are at separate workshop locations, not the tube-bending factory address above.
External finishingPlating, powder coating, painting and mirror polishing are outsourced to third-party finishing suppliers. Bare parts can be supplied when the customer arranges the finish.

For component scope, see handrail and guardrail tube components or motorcycle and automotive tube parts. We supply bent tube parts and welded sub-assemblies, not finished machines or complete rail systems.

Order size, timing and destinations

Prototype and production timing are separate. The drawing, tooling, material availability, order quantity and finishing requirements are reviewed before the delivery date is confirmed.

Prototype MOQ1 piece. One-off prototypes and small trial batches are accepted; prototype costs and sample freight are paid by the customer.
Standard prototype timing3 days for standard round tube with existing tooling and an approved, complete drawing, after the sample charge is received. This is not a promise for new tooling, non-standard material or every diameter/radius combination.
Production lead timeTypically 25–40 days after approval, subject to quantity, tooling, material and finishing. The schedule is confirmed per order.
Shipment destinationsParts have shipped to 8 countries: France, Hungary, Egypt, Thailand, Algeria, Sudan, Kazakhstan and South Africa. Destination history is not a certification or regulatory approval.

Certification, requested documents and limits

Put any material-certificate or testing requirements in the RFQ. We check the issuing source, batch availability and testing arrangements before accepting a document requirement; these are not standing promises of available reports.

ISO 9001 statusWe are not currently ISO 9001 certified. The previous certificate expired on 2025-09-08. The expired certificate is not evidence of current certification, and no renewal status is claimed here.
EN 10204 3.1 requirementsEN 10204 3.1 material test certificates are issued by the material mill, not self-issued by this tube-bending factory. State this requirement in the RFQ; supplier and order-batch availability must be confirmed before it is agreed.
Salt spray requirementsState the required test standard, duration and reporting requirement in the RFQ. Test arrangements, laboratory and report availability are agreed separately for the order; no fixed test duration or laboratory is promised here.
EN 1090We do not hold EN 1090 certification and do not offer EN 1090-certified structural steelwork.
IATF 16949We do not hold IATF 16949 certification.
Safety-critical applicationsWe do not accept safety-critical vehicle parts, such as forks, brakes or steering components, or safety-critical aircraft parts.
Finished-system conformityWe do not claim that our tube parts establish CE conformity for a complete machine, vehicle or rail system. Finished-product conformity and any component-specific requirements must be determined for the actual application.

For the document discussion, use quality and inspection. Send the drawing and requirements through the enquiry form or hi@newsiyuantube.com.