Home / Tube Bending / Tolerances
Typical custom tube bending tolerances at our shop are ±1 degree on bend angle, ±1 mm on centreline radius and tangent length, and ±0.5 mm on cut length. We are NewSiyuan Tube, a tube bending factory in Guangzhou, and we hold these on tube from 4 to 150 mm OD. Wall thinning stays within 15% and ovality within 8%. This page explains what each limit means physically and what to write on your drawing.
A tolerance list is only useful if you know what is being measured and where. Six numbers appear on almost every bent tube enquiry, and two of them are routinely misread — the centreline radius and the bend angle.
| Bend angle ±1° | One degree either side of the angle on your drawing, measured against the bending fixture rather than by eye. Its effect in millimetres grows with the length of the straight section after the bend — see the table below. |
|---|---|
| Centreline radius ±1 mm | The radius measured at the centreline of the tube, not the outside of the bend. The die is specified on the centreline, so this is the figure the tooling can actually be set to. |
| Tangent length ±1 mm | The straight run between the end of a bend and the next feature — a hole, a notch, the start of the next bend. It controls whether the part locates in your fixture. |
| Cut length ±0.5 mm | Overall length after cutting and before any end forming. If the ends get flared, threaded or notched afterwards, those operations carry their own allowance. |
| Wall thinning ≤15% | Measured on the outside of the bend and expressed against the nominal wall. Bending stretches the outer arc and compresses the inner one, so the thin point is always on the outside. |
| Ovality ≤8% | The difference between the largest and smallest diameter across the bend, as a percentage of nominal outside diameter. A Ø50 tube can go oval by up to 4 mm and still sit inside this limit. |
These are inspection criteria for standard bends on the materials and radii we quote, not a guarantee for every geometry. Tight radii, thin walls and hard alloys are assessed part by part. The same criteria are used on the inspection page and on the tube bending page; this page is where each one is unpacked.
A bend angle quoted in degrees feels small. On a long part it is not. The far end of a straight run swings sideways in proportion to its length, so the same one degree that is invisible on a 100 mm bracket becomes a visible gap on a 1 m frame.
| Straight run after the bend | 100 mm → about 1.7 mm of end displacement from one degree of angular error |
|---|---|
| 300 mm → about 5 mm | |
| 600 mm → about 10.5 mm | |
| 1000 mm → about 17 mm |
Wall thinning is the number that decides whether a part is safe to use rather than whether it fits. A 2 mm wall with 15% thinning is 1.7 mm at the outside of the bend. On a handrail post that is irrelevant. On a pressurised or load-bearing part it is the difference between a design that holds and one that fails slowly. Ovality matters in a different place: it decides whether a sleeve, a clamp or a tube insert still fits over the bend, and it is the reason a bent tube sometimes will not take a straight connector.
Bending runs from Ø4 to Ø150 mm outside diameter, in round, square and oval section, with wall from 0.8 to 5 mm. Carbon steel, 304 and 316L stainless, aluminium 6061, 6063 and 7075, copper and brass all run on the same floor. Above Ø90 mm there is one machine that can take the size, so those jobs are scheduled around it and lead time is quoted per part — not promised as a standard figure.
| Bending range | Ø4–150 mm OD · wall 0.8–5 mm · round, square, oval |
|---|---|
| Above Ø90 mm | One machine in this class — schedule is quoted per part, and the date is given after the drawing is checked |
| Laser tube cutting | Ø220 mm × 6 m on two machines — cutting only. Tube that is laser cut is bent on the bending machines above, not on the laser. |
| Aluminium | 6061, 6063 and 7075 bend; some tempers need annealing first, which is decided at the feasibility check |
A Ø220 mm tube can be cut here but not bent here. If a drawing needs both, the cutting is ours and the bending above Ø150 mm is not — say so early rather than at the sample stage. This distinction is also set out on the tube bending page.
Sample lead time is decided almost entirely by whether a die of the right centreline radius already exists. Three days assumes standard tube, a clear drawing and a die that is on the rack. Anything else moves the date, and the honest version of the date is given after the drawing has been read.
| Standard tube, die on the rack | 3 days to a sample, MOQ 1 piece |
|---|---|
| Material not in stock | 7–10 days to bring the tube in before bending starts |
| New die required | About 2 weeks to make the tooling |
| Then the first article | 3–5 days after tooling is ready, measured and reported before the batch is released |
| Production run | 25–40 days after sample approval, splittable into batches if you need part of the order earlier |
Most quoting delays come from a drawing that describes the part in a way the tooling cannot be set from. These are the items that make a drawing quotable on the first pass, whether you send it to us or to anyone else.
| 1. Centreline radius per bend | Not an outside radius, and not "R50 approx". Where a bend is a free-form sweep, say so and give the start and end tangents. |
|---|---|
| 2. Bend angle per bend | Included angle or deflection — either is fine, but mark which one. "90°" on a drawing is ambiguous when the part is bent twice in the same plane. |
| 3. Tangent lengths | The straight between bends. This is the dimension that decides whether the part assembles; overall length alone does not. |
| 4. Cut length, or the datum you measure from | If overall length is measured after end forming, say which operation comes last. |
| 5. Material and wall | Grade and nominal wall, in writing. "Stainless" is not enough to choose a die or predict springback. |
| 6. Which dimensions are critical | Mark the two or three that must hold. It changes how the part is measured and sometimes which machine it runs on. |
| 7. Surface finish and its sequence | If the part is coated or polished, say whether it is inspected before or after. Measuring after coating measures the coating too. |
Send a PDF or a STEP file to hi@newsiyuantube.com or on WhatsApp. The first reply says whether the radius, wall and material are workable, and which dimensions we would flag before quoting.
General information only — not engineering advice. Suitability for a specific application, load case or service environment must be confirmed by the buyer's engineer.
The first reply says whether the radius and wall can hold your tolerance, and where the risk is on that specific part.